The State of Connecticut, Department of Environmental Protection (CTDEP) is in the process of closing the Tire Pond in North Haven and Hamden, CT. Loureiro Engineering Associates, Inc. (LEA) is procuring 300,000 cubic yards of acceptable material in support of closure activities at this site.

The Tire Pond Site will be managed by LEA and its subsidiaries, with CTDEP oversight. Acceptable materials will be defined by a site specific material acceptance protocol and must meet this material acceptability protocol to qualify for reuse as grading and cover material during the closure of this site.

TIRE POND resources

Several documents have been posted for your download and use.

View downloads

TRUCK registration

For more information on truck registration click on the download button below.

View downloads

TAX information

Placement of material is taxable unless the generator has tax-exempt status or a direct pay permit from the State of Connecticut. If either of these applies, please provide the applicable documentation.

CONTACT US

For questions or updates please call us at
603-625-9688.